2018 CTH B and USH 41 Interchange, Suamico
Wisconsin Department of Transportation
Date Completed:
November 2018
Services:
Concrete Pavement, Earthwork & Grading, Underground Utilities, Custom Crushing
Design Engineer:
KL Engineering
Construction Engineer:
Wisconsin Department of Transportation
Project Summary:
Vinton Construction was a subcontractor on the CTH B and USH 41 interchange reconstruction from the North bound ramps to Velp Ave. USH 41 was brought up to Federal Highway standards with slope corrections of the medians for approximately 12 miles from Lineville Rd. to Oconto.
Contract Amount:
$17,958,809.00
Project Length:
12 Miles
By the Numbers:
- 15,700 SY of 8-inch Concrete Pavement
- 5300 SY of Removing Concrete Pavement
- 29631 CY of Common Excavation
- 25464 CY of Borrow
- 38000 Tons of Base Aggregate
- 6500 LF of Concrete Curb and Gutter
- 38000 SF of Concrete Sidewalk
- 1400 LF of Storm Sewer
- 168,000 SY of Salvaged Topsoil
- 48 Sewer Structures